CAFETERIA PROJECT
The 2nd Century Renovation began in December of 2007 with the much needed replacement of the cafeteria floor.

NORTH SIDE DRAINAGE
Throughout the summer of 2008, the drainage on the north side of the administrative building was improved to relieve the ice buildup that took place throughout the winter months.

BILLINGER FIELDHOUSE INFRASTRUCTURE AND LOCKER ROOMS
The improvements to our school continued in the summer of 2009 with reconstruction of three of the locker rooms in Al Billinger Fieldhouse. The Fieldhouse renovations also included bringing the mechanical and electrical infrastructure up to date. Much of the demolition was from the original construction of the fieldhouse.